Between 2007 and 2010 LHC carried out hydrogeological assessments for the wastewater disposal to ground facility upgrading and fire protection well testing.  The project included an Environmental Impact Assessment of sewage disposal impacts and designing a monitoring well network to determine long term impacts.  Well protection planning and retrofitting drinking water wells with surface seals was included in the upgrading.